PROJECT: Kaiser South San Francisco Medical Center
TYPE: Master Plan
SIZE: 14.5 AC
CLIENT: Kaiser Permanente
LOCATION: South San Francisco CA
STATUS: Pending Approval

Structural analysis of the existing hospital determined that the facility would need to be replaced by 2030 to meet SB1953 compliance for seismic upgrade. Kaiser was looking for an “on site” solution that would take advantage of the existing facilities.
In addition to planning for a new hospital the master plan phasing included an in depth analysis of the existing departments and level of care performed to determine short-term expansion/interior remodels or permanent off-site solutions to reduce operational costs and maintain care offered.

PROJECT TEAM: Charles Ackerley, Terri Walker, Clare Hyland